Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Oberdorf ‐ Freienalp





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Wildhaus
resort Bergbahnen Obertoggenburg
Region St. Gall
Country CH Switzerland, Confoederatio Helvetica
Name of lift Oberdorf ‐ Freienalp 
Type 6-CLD/B 
Lift manufacturer Garaventa 
Year of construction 2020 
Commissioning date 2020

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise 218 m
Route distance 1289 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type D3000
Cab manufacturer Garaventa
Cab model DCD 6
Bubble colour
Seating ??
Seat heater ??
Persons per cab
Number of cabs 54 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs 11,600,000  CHF 
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime ??
Situation of entrance parallel
Situation of exit ??
Loading carpet yes
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 22/05/21 10:29:16
PHOTOS: ????

Lift-Statistics
656 visit(s) since 07/12/20
Last visit 20/09/21

LIFT-WORLD IDs
Lift-ID: 20437
Place-ID: 2049

https://www.seilbahntechnik.net/en/lifts/20437/datas.htm