Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD Söllereck





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Oberstdorf
resort Soellereck
Region Bavaria, Bayern
Country DE Germany, Deutschland
Name of lift Söllereck 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2020 
Commissioning date 21/05/21

geometric data  
Height of valley station 990,7 m
Height of middle station(s) 1007,5 m
Height of mountain station 1357,5 m
Vertical rise 366,8 m
Route distance 2286,22 m
Horizontal length 2249,33 m
Average incline ?? %
Largest incline 45,9 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,9 m
Trackwidth line 6,1 m
Trackwidth return 4,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2200 (2400) Pers/h
Travel time 7,78 min
Driving speed line 6 m/s
Driving speed station 0,3 m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 794 kW
Drive power (Operation) 650 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive direct drive
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type LPA
Cab manufacturer ??
Cab model ??
Seating ??
Seat heater ??
Heater no
Aircon no
Persons per cab 10 
Number of cabs 65 (71) Stk
Cab distance 98,18 (90,0) m
Cab interval 16,36 (15,0) s
Garage type ground floor
Garage place Middle station(s)
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 29/05/21 18:08:21
PHOTOS: ????

Lift-Statistics
523 visit(s) since 08/12/20
Last visit 22/06/21

LIFT-WORLD IDs
Lift-ID: 20472
Place-ID: 152

https://www.seilbahntechnik.net/en/lifts/20472/datas.htm