Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Zakletý vrch





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Říčky v Orlických horách
resort
Region Královehradecký kraj, Královéhradecký kraj
Country CZ Czech republic, Česká republika
Name of lift Zakletý vrch 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2020 
Commissioning date 19/12/20
Second-hand lift. Formerly lift no. 715 

geometric data  
Height of valley station 746 m
Height of mountain station 992 m
Vertical rise 246 m
Route distance 1177 m
Horizontal length 1167 m
Average incline 21 %
Largest incline ?? %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 4,4 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Bubble colour neutral
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 74 Stk
Cab distance 34,7 m
Cab interval 7,7 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  CZK 
Currency (Construction costs) Czech koruna 
Construction period ?? months
Seasontime ❄ ☀ all-season
Situation of entrance parallel
Situation of exit parallel
Loading carpet yes
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21/02/21 07:50:37
PHOTOS: ????

Lift-Statistics
81 visit(s) since 09/12/20
Last visit 03/03/21

LIFT-WORLD IDs
Lift-ID: 20475
Place-ID: 1709

https://www.seilbahntechnik.net/en/lifts/20475/datas.htm