Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Kumme-Express II (Tufternchumme - Unterrothorn)



General information  
Place Zermatt 
resort Matterhorn Ski Paradise 
Region Valais 
Country   
Name of lift Kumme-Express II (Tufternchumme - Unterrothorn) 
Type 10-MGD 
Lift manufacturer Garaventa 
Year of construction 2020 
Commissioning date 19/12/20 


Infos for handicapped persons
Sorry, no information available.

Characteristics
First AURO (Autonomus Ropeway Operation) cable car in the world

geometric data  
Height of valley station 2660 m
Height of mountain station 3100 m
Vertical rise 440 m
Route distance 1847 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,4 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 Pers/h
Travel time 6,3 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type D5000 
Cab manufacturer CWA 
Cab model Omega V - 10 
Seating ?? 
Seat heater ?? 
Heater ?? 
Aircon ?? 
Persons per cab 10 
Number of cabs 32 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground 
Garage place mountain station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ?? 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period 7 months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 03/11/24
PHOTOS: ??

Lift-Statistics
3883 visit(s) since 22/01/21
Last visit 22/12/24

LIFT-WORLD IDs
Lift-ID: 20578
Place-ID: 2017

https://www.seilbahntechnik.net/en/lifts/20578/datas.htm