Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-MGD Waldecker Bergbahn

Valley Station
Valley Station

Inside the Valley Station
Inside the Valley Station

Valley Station
Valley Station

General information  
Place Waldeck 
resort ?? 
Region Hesse 
Country   
Name of lift Waldecker Bergbahn 
Type 2-MGD 
Lift manufacturer PHB 
Year of construction 1961 
Commissioning date 1961 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Doors must be opened and closed by hand!

geometric data  
Height of valley station 270 m
Height of mountain station 390 m
Vertical rise 120 m
Route distance 650 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 720 Pers/h
Travel time 3,0 min
Driving speed line 2,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 50 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Gangloff 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 28 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley and mountain 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 24 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime summer 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/07/23
PHOTOS: ??

Lift-Statistics
21570 visit(s) since 22/12/02
Last visit 11/10/24

LIFT-WORLD IDs
Lift-ID: 2137
Place-ID: 1975

https://www.seilbahntechnik.net/en/lifts/2137/datas.htm