Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD/B Asitzkogelbahn










General information  
Place Leogang 
resort Ski Alpin Card 
Region Salzburg 
Country   
Name of lift Asitzkogelbahn 
Type 8-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2022 
Commissioning date 16/12/22 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1674,1 m
Height of mountain station 1910,67 m
Vertical rise 236,50 m
Route distance 793,85 m
Horizontal length 755 m
Average incline 31,32 %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,7 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3700 Pers/h
Travel time 2,90 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 522 kW
Drive power (Operation) 403 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model DCD 8 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 44 Stk
Cab distance 46,70 m
Cab interval 7,78 s
Garage type station circulation 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 5 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit 90° 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) L7  

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 06/03/24
PHOTOS: ??

Lift-Statistics
3203 visit(s) since 29/10/22
Last visit 27/12/24

LIFT-WORLD IDs
Lift-ID: 21873
Place-ID: 296

https://www.seilbahntechnik.net/en/lifts/21873/datas.htm