Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Furglerblick

Valley station
Valley station

Route
Route

Route
Route

General information  
Place See 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Furglerblick 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2022 
Commissioning date 16/12/22 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 2174 m
Height of mountain station 2570 m
Vertical rise 396 m
Route distance 1134,67 m
Horizontal length 1061,81 m
Average incline 37,25 %
Largest incline ?? %
Number of pillars 7 Stk
Greatest spanwidth 470 m
Max ground clearance 43 m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 (2000) Pers/h
Travel time 4,74 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Frey Austria 
Remote control and telemonitoring system Frey Austria 
Power control system Frey Austria 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model OMEGA IV-8 
Seating carpet 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 29 Stk
Cab distance 180 m
Cab interval 36 s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 22/10/23
PHOTOS: ??

Lift-Statistics
1971 visit(s) since 26/11/22
Last visit 25/04/24

LIFT-WORLD IDs
Lift-ID: 21938
Place-ID: 120

https://www.seilbahntechnik.net/en/lifts/21938/datas.htm