Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Mittelstation







Mountain station
Mountain station

General information  
Place Soelden 
resort ?? 
Region Tyrol 
Country   
Name of lift Mittelstation 
Type 2-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1974 
Commissioning date 1974 
Date of closing down 2020 
Date of pull down 25/10/22 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1491 m
Height of mountain station 2178 m
Vertical rise 684 m
Route distance 1800 m
Horizontal length ?? m
Average incline 41,40 %
Largest incline 88,10 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 920 Pers/h
Travel time 12 min
Driving speed line 2,5 m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system Elin 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type 2FG 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 186 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) A15 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 08/11/22
PHOTOS: ??

Lift-Statistics
17310 visit(s) since 27/11/02
Last visit 18/03/24

LIFT-WORLD IDs
Lift-ID: 22
Place-ID: 1

https://www.seilbahntechnik.net/en/lifts/22/datas.htm