Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6/10-CGD Sûres



General information  
Place Auris-en-Oisans 
resort Alpe d'Huez 
Region Rhône-Alpes 
Country   
Name of lift Sûres 
Type 6/10-CGD 
Lift manufacturer Poma 
Year of construction 2022 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1600 m
Height of mountain station 1871 m
Vertical rise 271 m
Route distance 715 m
Horizontal length 683 m
Average incline 42,2 %
Largest incline 82,9 %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2650 Pers/h
Travel time 3,5 min
Driving speed line 5,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 530 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA-XL 
Cab manufacturer Sigma 
Cab model ?? 
Bubble colour ?? 
Seating leather 
Seat heater no 
Persons per cab 6/10 
Number of cabs 43 Stk
Cab distance 49,5 m
Cab interval 9 s
Garage type ground floor 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 06/04/24
PHOTOS: ??

Lift-Statistics
697 visit(s) since 08/01/23
Last visit 20/04/24

LIFT-WORLD IDs
Lift-ID: 22101
Place-ID: 953

https://www.seilbahntechnik.net/en/lifts/22101/datas.htm