Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


12-MGD Stalinem-Gardonè


Valley station
Valley station

Valley station
Valley station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Predazzo
resort
Dolomiti Superski
Region Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Stalinem-Gardonè 
Type 12-MGD 
Lift manufacturer Agamatic 
Year of construction 1995 
Commissioning date ??

geometric data  
Height of valley station 1049 m
Height of mountain station 1650 m
Vertical rise 601 m
Route distance 2464 m
Horizontal length 2291 m
Average incline 26,38 %
Largest incline 98,9 %
Number of pillars 29 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 8,2 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Austria Draht 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control EEI 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 1120 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Agamatic
Cab model ??
Seating ??
Seat heater no
Heater ??
Aircon ??
Persons per cab 12 
Number of cabs 61 Stk
Cab distance 90 m
Cab interval 18,0 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 06/11/15 21:36:49
PHOTOS: 30/01/08 15:58:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
11834 visit(s) since 20/03/04
Last visit 17/10/19

LIFT-WORLD IDs
Lift-ID: 2269
Place-ID: 1542

https://www.seilbahntechnik.net/en/lifts/2269/datas.htm