Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Sonnen



General information  
Place Steinhaus / Cadipietra 
resort Speikboden 
Region Trentino-South Tyrol 
Country   
Name of lift Sonnen 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2023 
Commissioning date 2023 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1436 m
Height of mountain station 2014 m
Vertical rise 578 m
Route distance 1458,81 m
Horizontal length 1327,5 m
Average incline 43,50 %
Largest incline 91,25 %
Number of pillars 13 Stk
Greatest spanwidth 228, m
Max ground clearance 26,7 m
Trackwidth drive 6,35 m
Trackwidth line 6,4 m
Trackwidth return 6,35 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 6,2 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 640 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model Omega V - 10 
Seating ?? 
Seat heater ?? 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 47 Stk
Cab distance 75 m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope 580 kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21/01/24
PHOTOS: ??

Lift-Statistics
561 visit(s) since 18/09/23
Last visit 02/05/24

LIFT-WORLD IDs
Lift-ID: 23056
Place-ID: 1608

https://www.seilbahntechnik.net/en/lifts/23056/datas.htm