Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  12-MGD Pradalago

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Madonna di Campiglio 
resort ?? 
Region Trentino-South Tyrol 
Country   
Name of lift Pradalago 
Type 12-MGD 
Lift manufacturer Agamatic 
Year of construction 1995 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1533 m
Height of middle station(s) ?? m
Height of mountain station 2093 m
Vertical rise 560 m
Route distance 1824,9 m
Horizontal length ?? m
Average incline 32,3 %
Largest incline 79,2 %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 6,17 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control BMB 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 942 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model BETA VISTA 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 12 
Number of cabs 60 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Redaelli 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction ?? 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 22/08/21
PHOTOS: ??

Lift-Statistics
13354 visit(s) since 07/03/04
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 2318
Place-ID: 1461

https://www.seilbahntechnik.net/en/lifts/2318/datas.htm