Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Höfener Alm

Line
Line

Mountain Station
Mountain Station

Valley Station
Valley Station

General information  
Place Reutte 
resort ?? 
Region Tyrol 
Country   
Name of lift Höfener Alm 
Type 2-CLF 
Lift manufacturer Steurer 
Year of construction 1984 
Commissioning date 1984 
Date of closing down 2010 
Date of pull down 2010 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Scrapped after dismantling!

geometric data  
Height of valley station 917 m
Height of middle station(s) ?? m
Height of mountain station 1686 m
Vertical rise 769 m
Route distance 2455 m
Horizontal length ?? m
Average incline 33,30 %
Largest incline 74,50 %
Number of pillars 23 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 816 Pers/h
Travel time 16,0 min
Driving speed line 2,5 m/s

electrical data  
Electrical control BBC 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating none 
Seat heater no 
Persons per cab
Number of cabs 222 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/11/24
PHOTOS: ??

Lift-Statistics
12011 visit(s) since 14/10/03
Last visit 22/12/24

LIFT-WORLD IDs
Lift-ID: 2328
Place-ID: 26

https://www.seilbahntechnik.net/en/lifts/2328/datas.htm