Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD Höfener Alm


Line
Line

Mountain Station
Mountain Station

Mountain Station
Mountain Station


Infos for handicapped persons
suitable

Characteristics
Sorry, no information available.

General information  
Place Reutte
resort Hahnenkamm Höfen

Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Höfener Alm 
Type 4-CLD 
Lift manufacturer Leitner 
Year of construction 2002 
Commissioning date 2002

geometric data  
Height of valley station 1528 m
Height of mountain station 1882 m
Vertical rise 354 m
Route distance 1105 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 3,7 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 46 Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 30/09/17 21:03:59
PHOTOS: 23/03/04 22:30:04

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
6267 visit(s) since 27/03/03
Last visit 08/04/20

LIFT-WORLD IDs
Lift-ID: 2329
Place-ID: 26

https://www.seilbahntechnik.net/en/lifts/2329/datas.htm