Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Asitzbahn I

Mountain station
Mountain station

Mountain station
Mountain station

Valley station
Valley station

General information  
Place Leogang 
resort Ski Alpin Card 
Region Salzburg 
Country   
Name of lift Asitzbahn I 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1991 
Commissioning date 14/12/91 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 829 m
Height of mountain station 1302 m
Vertical rise 473 m
Route distance 1443 m
Horizontal length ?? m
Average incline 36,2 %
Largest incline 59,7 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 11,2 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Frey Austria 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DS 108 
Cab manufacturer CWA 
Cab model OMEGA 8s 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 132 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Austria Draht 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) L1  

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27/02/24
PHOTOS: ??

Lift-Statistics
20995 visit(s) since 01/04/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 2340
Place-ID: 296

https://www.seilbahntechnik.net/en/lifts/2340/datas.htm