Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Pöllingerbahn










General information  
Place Annenheim 
resort Gerlitzen 
Region Carinthia 
Country   
Name of lift Pöllingerbahn 
Type 2-CLF 
Lift manufacturer De Pretis 
Year of construction 1970 
Commissioning date 22/12/70 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1507 m
Height of mountain station 1659 m
Vertical rise 152 m
Route distance 604 m
Horizontal length 583 m
Average incline 26,10 %
Largest incline 42,90 %
Number of pillars 6 Stk
Greatest spanwidth 160 m
Max ground clearance ?? m
Trackwidth drive 3,6 m
Trackwidth line 3,6 m
Trackwidth return 3,6 m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 900 Pers/h
Travel time 4,5 min
Driving speed line 2,25 m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system Siemens 
Power control system Siemens 
Number of drive 1 Stk
Drive power (Start) 57 kW
Drive power (Operation) 44 kW
Brake power 31 kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive mechanical 

cabins data  
Grip type ?? 
Cab manufacturer Girak 
Cab model ?? 
Seating duckboard (timber) 
Seat heater no 
Persons per cab
Number of cabs 68 Stk
Cab distance 18 m
Cab interval 8 s


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 1300 m
Total weight of haul rope 3,9 t
Haul rope diameter 29 mm
Nominal strength of haul rope 1770 N/mm²
Breaking strength of rope 554 kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way 2,5 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 7 months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21/10/22
PHOTOS: ??

Lift-Statistics
19534 visit(s) since 09/12/03
Last visit 19/04/24

LIFT-WORLD IDs
Lift-ID: 2452
Place-ID: 31

https://www.seilbahntechnik.net/en/lifts/2452/datas.htm