Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Teleférico de Kuélap



General information  
Place Tingo 
resort ?? 
Region Amazonas 
Country   
Name of lift Teleférico de Kuélap 
Type 8-MGD 
Lift manufacturer Poma 
Year of construction 2014 
Commissioning date 02/03/17 


Infos for handicapped persons
The first ropeway in Peru.
The ropeway connects the Kuélap Fortress (pre-Inca archaeological center of the Chachapoyas culture) with the town of Nuevo Tingo in the jungle. It crosses 60 m above the Tingo River and covers a total distance of 4 kilometers, which will be traveled in approximately 20 minutes and with a capacity of 8 passengers per cable car.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 2100 m
Height of mountain station 2930 m
Vertical rise 830 m
Route distance 4500 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 22 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 150 Pers/h
Travel time 20 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating ?? 
Seat heater ?? 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 26 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? USD
Currency (Construction costs) United States dollar 
Construction period 23 months
Seasontime ??  
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21/09/24
PHOTOS: ??

Lift-Statistics
86 visit(s) since 18/09/23
Last visit 05/10/24

LIFT-WORLD IDs
Lift-ID: 24611
Place-ID: 2669

https://www.seilbahntechnik.net/en/lifts/24611/datas.htm