Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Porzen



General information  
Place Sexten / Sesto 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift Porzen 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2024 
Commissioning date 30 nov 2024 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1665,0 m
Height of mountain station 1977,00 m
Vertical rise 312,00 m
Route distance 1295,41 m
Horizontal length 1250,00 m
Average incline 24,96 %
Largest incline 52,00 %
Number of pillars 10 Stk
Greatest spanwidth 226 m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 4,32 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 500 kW
Drive power (Operation) 380 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type LPA 
Cab manufacturer Leitner 
Cab model EVO 6 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 62 Stk
Cab distance 45 m
Cab interval 9,00 s
Garage type underground 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Situation of entrance 90° 
Situation of exit 90° 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11 feb 2025
PHOTOS: ??

Lift-Statistics
758 visit(s) since 18 set 2023
Last visit 4 apr 2025

LIFT-WORLD IDs
Lift-ID: 24753
Place-ID: 1600

https://www.seilbahntechnik.net/en/lifts/24753/datas.htm