Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Braia Fraida



General information  
Place Corvara 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift Braia Fraida 
Type 6-CLD 
Lift manufacturer Leitner 
Year of construction 2024 
Commissioning date 05/12/24 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Downhill transport (in winter?) is only from the mountain station to the one-way intermediate station.

geometric data  
Height of valley station 1899,5 m
Height of middle station(s) 2026,3 m
Height of mountain station 2023,0 m
Vertical rise 123,5 m
Route distance 1184,6 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 4,0 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model EVO 6 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 70 Stk
Cab distance 38,57 m
Cab interval 7,71 s
Garage type underground 
Garage place Middle station(s) 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 30/11/24
PHOTOS: ??

Lift-Statistics
466 visit(s) since 18/09/23
Last visit 19/01/25

LIFT-WORLD IDs
Lift-ID: 24757
Place-ID: 1383

https://www.seilbahntechnik.net/en/lifts/24757/datas.htm