Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Valcigolera



General information  
Place San Martino di Castrozza 
resort ?? 
Region Trentino-South Tyrol 
Country   
Name of lift Valcigolera 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2024 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise 465 m
Route distance ?? m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 6 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 900 (1500) Pers/h
Travel time 3,5 min
Driving speed line ?? m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Sigma 
Cab model ?? 
Seating ?? 
Seat heater ?? 
Heater ?? 
Aircon ?? 
Persons per cab 10 
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ?? 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) 26 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 4 Nov 2024
PHOTOS: ??

Lift-Statistics
579 visit(s) since 18 Sept 2023
Last visit 3 Apr 2025

LIFT-WORLD IDs
Lift-ID: 24820
Place-ID: 1575

https://www.seilbahntechnik.net/en/lifts/24820/datas.htm