Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Vallon de l'Iseran



General information  
Place Val d'Isère 
resort Espace Killy 
Region Rhône-Alpes 
Country   
Name of lift Vallon de l'Iseran 
Type 10-MGD 
Lift manufacturer Poma 
Year of construction 2024 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 2330 m
Height of mountain station 2797 m
Vertical rise 467 m
Route distance 2703 m
Horizontal length 2669 m
Average incline 17,54 %
Largest incline 59,77 %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,9 m
Trackwidth line 6,6 m
Trackwidth return 5,3 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 6,5 min
Driving speed line 7,0 m/s
Driving speed station 0,3 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 879 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA-XL 
Cab manufacturer Sigma 
Cab model DIAMOND - Evo Xline 
Seating leather 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 61 Stk
Cab distance 105 m
Cab interval 14,96 s
Garage type underground 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: May 13, 2025
PHOTOS: ??

Lift-Statistics
745 visit(s) since Sep 18, 2023
Last visit Jun 7, 2025

LIFT-WORLD IDs
Lift-ID: 24823
Place-ID: 1231

https://www.seilbahntechnik.net/en/lifts/24823/datas.htm