Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Lago Goillet



General information  
Place Breuil-Cervinia 
resort Matterhorn Ski Paradise 
Region Valle d'Aosta 
Country   
Name of lift Lago Goillet 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2024 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
EcoDrive

geometric data  
Height of valley station 2692,4 m
Height of mountain station 3093,6 m
Vertical rise 401,2 m
Route distance 1460,45 m
Horizontal length 1390 m
Average incline 38,86 %
Largest incline 58,50 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,4 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 4,85 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 642 kW
Drive power (Operation) 506 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour ?? 
Seating ?? 
Seat heater ?? 
Persons per cab
Number of cabs 69 Stk
Cab distance 45 m
Cab interval 9 s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 06/11/24
PHOTOS: ??

Lift-Statistics
115 visit(s) since 18/09/23
Last visit 23/11/24

LIFT-WORLD IDs
Lift-ID: 24835
Place-ID: 1327

https://www.seilbahntechnik.net/en/lifts/24835/datas.htm