Lift-Database » Lifts in the world
125-FUC Rosshütte
Cabin
Mountain Station
Valley Station
General information | |
---|---|
Place | Seefeld |
resort | Gschwandtkopf |
Region | Tyrol |
Country | |
Name of lift | Rosshütte |
Type | 125-FUC |
Lift manufacturer | Vöest-Alpine |
Year of construction | 1969 |
Commissioning date | 20/12/69 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1235 m |
Height of mountain station | 1762 m |
Vertical rise | 527 m |
Route distance | 2417 m |
Horizontal length | ?? m |
Average incline | 21,40 % |
Largest incline | 37,20 % |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1200 Pers/h |
Travel time | 5,0 min |
Driving speed line | 12,0 m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Gangloff |
Cab model | ?? |
Seating | ?? |
Seat heater | no |
Heater | no |
Aircon | no |
Persons per cab | 125 |
Number of cabs | 2 Stk |
Carriage Operator | yes |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Length of counter-rope | ?? m |
Total weight of haul rope | ?? t |
Total weight of counter-rope | ?? t |
Haul rope diameter | 36 mm |
Counter-rope diameter | 21 mm |
Nominal strength of haul rope | ?? N/mm² |
Nominal strength of counter-rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Breaking strength of counter-rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | rope tension weight |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | 10 months |
Seasontime | ❄ ☀ all-season |
Type of turnout | ?? |
Integrated rescue system | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 04/02/23
PHOTOS: ??
Lift-Statistics
20854 visit(s) since 16/05/03
Last visit 13/01/25
LIFT-WORLD IDs
Lift-ID: 2551
Place-ID: 113
https://www.seilbahntechnik.net/en/lifts/2551/datas.htm
Datas: 04/02/23
PHOTOS: ??
Lift-Statistics
20854 visit(s) since 16/05/03
Last visit 13/01/25
LIFT-WORLD IDs
Lift-ID: 2551
Place-ID: 113
https://www.seilbahntechnik.net/en/lifts/2551/datas.htm