Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD/B Einzeigerbahn



General information  
Place Soelden 
resort ?? 
Region Tyrol 
Country   
Name of lift Einzeigerbahn 
Type 8-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2025 
Commissioning date 8 nov. 2025 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 2504 m
Height of mountain station 2766 m
Vertical rise 262,01 m
Route distance 1086,13 m
Horizontal length 1037,50 m
Average incline ?? %
Largest incline ?? %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,70 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 4000 Pers/h
Travel time 3,54 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system ABB 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type D5000 
Cab manufacturer Doppelmayr 
Cab model DCD 8 
Bubble colour neutral 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 59 Stk
Cab distance 43,20 m
Cab interval 7,20 s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 5 m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Autonomous ropeway yes 
Asset number (Trail map) D51 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 10 nov. 2025
PHOTOS: ??

Lift-Statistics
739 visit(s) since 24 oct. 2025
Last visit 3 déc. 2025

LIFT-WORLD IDs
Lift-ID: 26018
Place-ID: 1

https://www.seilbahntechnik.net/en/lifts/26018/datas.htm