  8-CLD/B Silberbrünnlbahn



General information  
Place Soelden 
resort ?? 
Region Tyrol 
Country   
Name of lift Silberbrünnlbahn 
Type 8-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2025 
Commissioning date 11 / 2025 


Infos for handicapped persons
Sorry, no information available.

Characteristics
chair-garage taken over from the predecessor (build in 2015)

geometric data  
Height of valley station 2278 m
Height of mountain station 2663 m
Vertical rise 388,85 m
Route distance 1696,10 m
Horizontal length 1644,50 m
Average incline ?? %
Largest incline ?? %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,70 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3800 Pers/h
Travel time 5,24 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system ABB 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type D5000 
Cab manufacturer Doppelmayr 
Cab model DCD 8 
Bubble colour neutral 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 83 Stk
Cab distance 45,48 m
Cab interval 7,58 s
Garage type underground 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Autonomous ropeway yes 
Asset number (Trail map) C35 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: Oct 27, 2025
PHOTOS: ??

Lift-Statistics
705 visit(s) since Oct 24, 2025
Last visit Dec 1, 2025

LIFT-WORLD IDs
Lift-ID: 26019
Place-ID: 1

https://www.seilbahntechnik.net/en/lifts/26019/datas.htm