Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD Flying Mozart 2












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Wagrain
resort Ski amadé
Salzburger Sportwelt
Region Salzburg
Country AT Austria, Österreich
Name of lift Flying Mozart 2 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1988 
Commissioning date ??

geometric data  
Height of valley station 1250 m
Height of mountain station 1814 m
Vertical rise 564 m
Route distance 1955 m
Horizontal length ?? m
Average incline 31,40 %
Largest incline ?? %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 6,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control STG 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DS 215
Cab manufacturer CWA
Cab model BETA VISTA
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab 10 
Number of cabs 60 Stk
Cab distance 75 m
Cab interval 15 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 02/04/19 08:16:03
PHOTOS: 20/09/07 21:59:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
19355 visit(s) since 29/08/03
Last visit 17/10/19

LIFT-WORLD IDs
Lift-ID: 2669
Place-ID: 213

https://www.seilbahntechnik.net/en/lifts/2669/datas.htm