Lift-Database » Lifts in the world

  4-CLF Pfeifferköpflbahn



General information  
Place Neukirchen am Grossvenediger 
resort ?? 
Region Salzburg 
Country   
Name of lift Pfeifferköpflbahn 
Type 4-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1995 
Commissioning date ?? 
Date of closing down 2004 
Date of pull down 2004 
Second-hand lift. Formerly lift no. 14869 


Infos for handicapped persons
Sorry, no information available.

Characteristics
second-hand Lift, former Ganseralmbahn, sold to Libanon

geometric data  
Height of valley station 1769 m
Height of middle station(s) ?? m
Height of mountain station 2128 m
Vertical rise 359 m
Route distance 1087 m
Horizontal length 1026,85 m
Average incline 35,20 %
Largest incline 66,80 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 Pers/h
Travel time 8,0 min
Driving speed line 2,4 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 189 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 115 Stk
Cab distance 19,21 m
Cab interval 9,61 s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 06/12/24
PHOTOS: ??

Lift-Statistics
10069 visit(s) since 09/10/03
Last visit 03/01/25

LIFT-WORLD IDs
Lift-ID: 2766
Place-ID: 188

https://www.seilbahntechnik.net/en/lifts/2766/datas.htm