Lift-Database » Lifts in the world
6-MGD Olympe II

Mountain station

Line
| General information | |
|---|---|
| Place | Meribel |
| resort | Les Trois Vallées |
| Region | Rhône-Alpes |
| Country | |
| Name of lift | Olympe II |
| Type | 6-MGD |
| Lift manufacturer | Poma |
| Year of construction | 1990 |
| Commissioning date | 1990 |
| Infos for handicapped persons |
|---|
| Sorry, no information available. |
| Characteristics |
|---|
| Sorry, no information available. |
| geometric data | |
|---|---|
| Height of valley station | 1112 m |
| Height of middle station(s) | 1315 m |
| Height of mountain station | 1442 m |
| Vertical rise | 330 m |
| Route distance | 3818 m |
| Horizontal length | 3804 m |
| Average incline | 9 % |
| Largest incline | 35 % |
| Number of pillars | 37 Stk |
| Greatest spanwidth | ?? m |
| Max ground clearance | ?? m |
| Trackwidth drive | ?? m |
| Trackwidth line | ?? m |
| Trackwidth return | ?? m |
| Angle of wrap (drive wheel) | ?? ° |
| Drive altitude of site | ?? m |
| Maximum capacity | 1400 Pers/h |
| Travel time | 12,73 min |
| Driving speed line | 5 m/s |
| Driving speed station | ?? m/s |
| electrical data | |
|---|---|
| Electrical control | Semer |
| Remote control and telemonitoring system | ?? |
| Power control system | ?? |
| Number of drive | ?? Stk |
| Drive power (Start) | 450 kW |
| Drive power (Operation) | ?? kW |
| Brake power | ?? kW |
| Continuous brake power | ?? kW |
| Driving station | Mountain station |
| Drive type | electrical |
| Traction of drive | electromechanical |
| Emergency drive | diesel engine |
| Traction of emergency drive | ?? |
| cabins data | |
|---|---|
| Grip type | ?? |
| Cab manufacturer | Sigma |
| Cab model | ?? |
| Seating | ?? |
| Seat heater | no |
| Heater | no |
| Aircon | no |
| Persons per cab | 6 |
| Number of cabs | 79 Stk |
| Cab distance | 36 m |
| Cab interval | 7,2 s |
| Garage type | ground floor |
| Garage place | Middle station(s) |
| Garage direction | ?? |
| Loading direction | ?? |
| rope data | |
|---|---|
| Rope manufacturer | Tréfileurope |
| Length of haul rope | 7850 m |
| Total weight of haul rope | ?? t |
| Haul rope diameter | 43 mm |
| Nominal strength of haul rope | ?? N/mm² |
| Breaking strength of rope | ?? kN |
| Tensionstation haulrope | Mountain station |
| Tension type | hydraulical (controlled) |
| Tension way | ?? m |
| miscellaneous data | |
|---|---|
| Transport uphill | 100 % |
| Transport downhill | 100 % |
| Drive direction | left |
| Construction costs | ?? FRF |
| Currency (Construction costs) | French franc |
| Construction period | ?? months |
| Seasontime | ❄ ☀ all-season |
| Evacuation ropeway | no |
| Integrated rescue system | no |
| Rope position control | no |
| Autonomous ropeway | no |
| Asset number (Trail map) | ?? |
Updates
Datas: 29 gen 2022
PHOTOS: ??
Lift-Statistics
14471 visit(s) since 19 mar 2005
Last visit 27 ott 2025
LIFT-WORLD IDs
Lift-ID: 2800
Place-ID: 1130
https://www.seilbahntechnik.net/en/lifts/2800/datas.htm
Datas: 29 gen 2022
PHOTOS: ??
Lift-Statistics
14471 visit(s) since 19 mar 2005
Last visit 27 ott 2025
LIFT-WORLD IDs
Lift-ID: 2800
Place-ID: 1130
https://www.seilbahntechnik.net/en/lifts/2800/datas.htm

Deutsch
English
Français
Italiano
Česky
Nederlands
