  8-MGD Saint Martin 1










General information  
Place Saint-Martin-de-Belleville 
resort Les Trois Vallées 
Region Rhône-Alpes 
Country   
Name of lift Saint Martin 1 
Type 8-MGD 
Lift manufacturer Poma 
Year of construction 2002 
Commissioning date 2002 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1427 m
Height of mountain station 1801 m
Vertical rise 374 m
Route distance 1981 m
Horizontal length ?? m
Average incline ?? %
Largest incline 50 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,7 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 (2800) Pers/h
Travel time 5,5 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 692 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Sigma 
Cab model ?? 
Seating none 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 75 Stk
Cab distance 61,71 m
Cab interval 10,3 s
Garage type ground floor 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ??  
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 09/10/21
PHOTOS: ??

Lift-Statistics
9761 visit(s) since 05/07/03
Last visit 22/12/24

LIFT-WORLD IDs
Lift-ID: 2803
Place-ID: 1219