Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Skyeship Express Stage I



General information  
Place Killington 
resort Pico Mountain 
Region Vermont 
Country   
Name of lift Skyeship Express Stage I 
Type 8-MGD 
Lift manufacturer Poma 
Year of construction 1994 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Can either be run independently or slaved together with Stage I

geometric data  
Height of valley station ?? m
Height of middle station(s) ?? m
Height of mountain station ?? m
Vertical rise 362 m
Route distance 2392 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 29 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time ?? min
Driving speed line 6,1 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model OMEGA 8s 
Seating ?? 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ?? 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 08/12/22
PHOTOS: ??

Lift-Statistics
3578 visit(s) since 19/03/05
Last visit 25/11/24

LIFT-WORLD IDs
Lift-ID: 2872
Place-ID: 3551

https://www.seilbahntechnik.net/en/lifts/2872/datas.htm