Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Lac Noir-Chaux Ronde

Mountain station
Mountain station







General information  
Place Villars-sur-Ollon 
resort Villars-Gryon 
Region Vaud 
Country   
Name of lift Lac Noir-Chaux Ronde 
Type 4-CLD 
Lift manufacturer Baco 
Year of construction 1995 
Commissioning date 1995 
Date of closing down 2022 
Date of pull down 2022 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1724 m
Height of mountain station 1982 m
Vertical rise 258 m
Route distance 989 m
Horizontal length ?? m
Average incline 27 %
Largest incline 75,9 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 3,28 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Alptronic 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 413 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Poma 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 95 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime ??  
Situation of entrance ?? 
Situation of exit ?? 
Loading carpet ?? 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 13/06/22
PHOTOS: ??

Lift-Statistics
4601 visit(s) since 29/12/03
Last visit 17/04/24

LIFT-WORLD IDs
Lift-ID: 2997
Place-ID: 2313

https://www.seilbahntechnik.net/en/lifts/2997/datas.htm