Lift-Database » Lifts in the world
4-CLF Gammeringbahn


General information | |
---|---|
Place | Spital am Pyhrn |
resort | ?? |
Region | Upper Austria |
Country | ![]() |
Name of lift | Gammeringbahn |
Type | 4-CLF |
Lift manufacturer | Leitner |
Year of construction | 2000 |
Commissioning date | 12 / 2000 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1372 m |
Height of middle station(s) | 230 m |
Height of mountain station | 1602 m |
Vertical rise | 230 m |
Route distance | 896,13 m |
Horizontal length | 862,12 m |
Average incline | 26,66 % |
Largest incline | 43,7 % |
Number of pillars | 10 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | 5,30 m |
Trackwidth line | 5,30 m |
Trackwidth return | 5,30 m |
Angle of wrap (drive wheel) | 180 ° |
Drive altitude of site | ?? m |
Maximum capacity | 2170 Pers/h |
Travel time | 5,45 min |
Driving speed line | 2,6 m/s |
electrical data | |
---|---|
Electrical control | Leitner |
Remote control and telemonitoring system | Leitner |
Power control system | Leitner |
Number of drive | 1 Stk |
Drive power (Start) | 253 kW |
Drive power (Operation) | 144 kW |
Brake power | -72 kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | diesel engine |
Traction of emergency drive | hydrostatic |
cabins data | |
---|---|
Grip type | 4FG |
Cab manufacturer | Leitner |
Cab model | ?? |
Seating | leather |
Seat heater | no |
Persons per cab | 4 |
Number of cabs | 106 Stk |
Cab distance | 17,25 m |
Cab interval | 6,63 s |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | 1830 m |
Total weight of haul rope | ?? t |
Haul rope diameter | 36 mm |
Nominal strength of haul rope | 1770 N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Mountain station |
Tension type | hydraulical (controlled) |
Tension way | 3 m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | ?? months |
Seasontime | ❄ winter |
Loading carpet | yes |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | C |
Updates
Datas: 05/08/24
PHOTOS: ??
Lift-Statistics
7500 visit(s) since 14/01/04
Last visit 19/03/25
LIFT-WORLD IDs
Lift-ID: 3072
Place-ID: 542
https://www.seilbahntechnik.net/en/lifts/3072/datas.htm
Datas: 05/08/24
PHOTOS: ??
Lift-Statistics
7500 visit(s) since 14/01/04
Last visit 19/03/25
LIFT-WORLD IDs
Lift-ID: 3072
Place-ID: 542
https://www.seilbahntechnik.net/en/lifts/3072/datas.htm