Lift-Database » Lifts in the world
2-CLF Spielbergalmbahn
General information | |
---|---|
Place | Gaissau |
resort | ?? |
Region | Salzburg |
Country | |
Name of lift | Spielbergalmbahn |
Type | 2-CLF |
Lift manufacturer | Doppelmayr |
Year of construction | 1969 |
Commissioning date | 1970 |
Date of closing down | 21/03/22 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Intermediate Station out of order. |
geometric data | |
---|---|
Height of valley station | 864 m |
Height of middle station(s) | 1137 m |
Height of mountain station | 1310 m |
Vertical rise | 446 m |
Route distance | 2327 m |
Horizontal length | 2029 m |
Average incline | 19,50 % |
Largest incline | ?? % |
Number of pillars | 19 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 870 Pers/h |
Travel time | 19,4 min |
Driving speed line | 2,0 m/s |
electrical data | |
---|---|
Electrical control | Siemens |
Remote control and telemonitoring system | Doppelmayr |
Power control system | Doppelmayr |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | 264 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | diesel engine |
Traction of drive | electromechanical |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Doppelmayr |
Cab model | ?? |
Seating | duckboard (plastic) |
Seat heater | no |
Persons per cab | 2 |
Number of cabs | 230 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
rope data | |
---|---|
Rope manufacturer | Austria Draht |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | rope tension weight |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | left |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | 4 months |
Seasontime | ❄ winter |
Loading carpet | no |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | A |
Updates
Datas: 18/09/24
PHOTOS: ??
Lift-Statistics
14808 visit(s) since 10/05/04
Last visit 30/12/24
LIFT-WORLD IDs
Lift-ID: 3157
Place-ID: 248
https://www.seilbahntechnik.net/en/lifts/3157/datas.htm
Datas: 18/09/24
PHOTOS: ??
Lift-Statistics
14808 visit(s) since 10/05/04
Last visit 30/12/24
LIFT-WORLD IDs
Lift-ID: 3157
Place-ID: 248