Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Weinbergbahn

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Landeck 
resort ?? 
Region Tyrol 
Country   
Name of lift Weinbergbahn 
Type 4-CLD/B 
Lift manufacturer Leitner 
Year of construction 1998 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1718 m
Height of mountain station 2206 m
Vertical rise 488 m
Route distance 1235 m
Horizontal length 1134 m
Average incline 43,00 %
Largest incline 65,00 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1829 Pers/h
Travel time 4,7 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control STG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 75 Stk
Cab distance 35,42 m
Cab interval 7,87 s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/09/22
PHOTOS: ??

Lift-Statistics
4030 visit(s) since 26/09/03
Last visit 07/06/23

LIFT-WORLD IDs
Lift-ID: 3185
Place-ID: 470

https://www.seilbahntechnik.net/en/lifts/3185/datas.htm