Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Hirnkopflift

Mountain Station
Mountain Station

Mountain Station
Mountain Station

Line
Line

General information  
Place Flattnitz 
resort ?? 
Region Carinthia 
Country   
Name of lift Hirnkopflift 
Type 2-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1996 
Commissioning date 1996 
Second-hand lift. Formerly lift no. 14503 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Used ropeway from Zell am Ziller, reconstruction by De Pretis company

geometric data  
Height of valley station 1400 m
Height of middle station(s) ?? m
Height of mountain station 1840 m
Vertical rise 440 m
Route distance 1368 m
Horizontal length ?? m
Average incline 33,78 %
Largest incline 35,20 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 876 Pers/h
Travel time 8,5 min
Driving speed line 2,4 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 140 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 10/03/24
PHOTOS: ??

Lift-Statistics
7632 visit(s) since 21/11/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 3199
Place-ID: 401

https://www.seilbahntechnik.net/en/lifts/3199/datas.htm