Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Sternstein

Sternstein 2-CLF
Sternstein 2-CLF

General information  
Place Bad Leonfelden 
resort ?? 
Region Upper Austria 
Country   
Name of lift Sternstein 
Type 2-CLF 
Lift manufacturer Swoboda 
Year of construction 1985 
Commissioning date ?? 
Date of closing down 2009 
Date of pull down 2009 
Second-hand lift. Formerly lift no. 13475 


Infos for handicapped persons
Sorry, no information available.

Characteristics
second-hand Lift from Lofer (former Loferer-Almbahn I)

geometric data  
Height of valley station 800 m
Height of middle station(s) ?? m
Height of mountain station 1100 m
Vertical rise 291 m
Route distance 1395 m
Horizontal length 1363 m
Average incline 21,40 %
Largest incline 46,00 %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1118 Pers/h
Travel time 9,3 min
Driving speed line 2,5 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 180 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Swoboda 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 175 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 31 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 4 nov. 2023
PHOTOS: ??

Lift-Statistics
7805 visit(s) since 21 déc. 2003
Last visit 17 févr. 2026

LIFT-WORLD IDs
Lift-ID: 3208
Place-ID: 371

https://www.seilbahntechnik.net/en/lifts/3208/datas.htm