Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF/B Elferbahn



General information  
Place Neustift im Stubaital 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Elferbahn 
Type 2-CLF/B 
Lift manufacturer Leitner 
Year of construction 1987 
Commissioning date ?? 
Date of closing down 2004 
Date of pull down 2004 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 983,15 m
Height of mountain station 1796,55 m
Vertical rise 812,7 m
Route distance 1795 m
Horizontal length 1592 m
Average incline 51 %
Largest incline 78,53 %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,40 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 936 Pers/h
Travel time 15,3 min
Driving speed line 1,95 m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 430 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 242 Stk
Cab distance 15 m
Cab interval 7,6 s


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 31/12/23
PHOTOS: ??

Lift-Statistics
10359 visit(s) since 19/10/03
Last visit 18/03/24

LIFT-WORLD IDs
Lift-ID: 328
Place-ID: 87

https://www.seilbahntechnik.net/en/lifts/328/datas.htm