Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Doppelsesselbahn Neunerköpfle

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Tannheim 
resort ?? 
Region Tyrol 
Country   
Name of lift Doppelsesselbahn Neunerköpfle 
Type 2-CLF 
Lift manufacturer Felix Wopfner 
Year of construction 1972/13 
Commissioning date ?? 


Infos for handicapped persons
not suitable

Characteristics
In 2013 the chairlift was renovated and brought up to date!

geometric data  
Height of valley station 1490 m
Height of mountain station 1790 m
Vertical rise 303 m
Route distance 1006 m
Horizontal length 988 m
Average incline 31,00 %
Largest incline 58,00 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 730 Pers/h
Travel time 7,4 min
Driving speed line 2,25 m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system Elin 
Power control system Elin 
Number of drive 1 Stk
Drive power (Start) 69,5 kW
Drive power (Operation) ?? kW
Brake power -140 kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive gas engine 
Traction of emergency drive mechanical 

cabins data  
Grip type 2FG 
Cab manufacturer Doppelmayr 
Cab model 2E Fix 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 85 Stk
Cab distance 5 m
Cab interval ?? s


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 32 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21 Jul 2024
PHOTOS: ??

Lift-Statistics
13524 visit(s) since 20 Feb 2005
Last visit 8 Jun 2025

LIFT-WORLD IDs
Lift-ID: 3407
Place-ID: 567

https://www.seilbahntechnik.net/en/lifts/3407/datas.htm