Lift-Database » Lifts in the world
3-CLF Wannenjochbahn
General information | |
---|---|
Place | Schattwald |
resort | ?? |
Region | Tyrol |
Country | |
Name of lift | Wannenjochbahn |
Type | 3-CLF |
Lift manufacturer | Doppelmayr |
Year of construction | 1993 |
Commissioning date | 12 / 1993 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1095 m |
Height of mountain station | 1575 m |
Vertical rise | 476 m |
Route distance | 1338,27 m |
Horizontal length | 1247,06 m |
Average incline | 38,13 % |
Largest incline | 60,80 % |
Number of pillars | 13 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | 4 m |
Trackwidth line | 4 m |
Trackwidth return | 4 m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1695 Pers/h |
Travel time | 8,58 min |
Driving speed line | 2,6 m/s |
electrical data | |
---|---|
Electrical control | Siemens |
Remote control and telemonitoring system | ?? |
Power control system | Siemens |
Number of drive | 1 Stk |
Drive power (Start) | 345 kW |
Drive power (Operation) | 279 kW |
Brake power | 279 kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | diesel engine |
Traction of emergency drive | hydrostatic |
cabins data | |
---|---|
Grip type | 4FG |
Cab manufacturer | Doppelmayr |
Cab model | 3E98/B |
Seating | polystyrene |
Seat heater | no |
Persons per cab | 3 |
Number of cabs | 163 Stk |
Cab distance | 16,75 m |
Cab interval | 8,58 s |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 38 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | right |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | ?? months |
Seasontime | ❄ ☀ all-season |
Loading carpet | yes |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | ?? |
Updates
Datas: 15/05/23
PHOTOS: ??
Lift-Statistics
16229 visit(s) since 31/07/04
Last visit 28/12/24
LIFT-WORLD IDs
Lift-ID: 3418
Place-ID: 534
https://www.seilbahntechnik.net/en/lifts/3418/datas.htm
Datas: 15/05/23
PHOTOS: ??
Lift-Statistics
16229 visit(s) since 31/07/04
Last visit 28/12/24
LIFT-WORLD IDs
Lift-ID: 3418
Place-ID: 534
https://www.seilbahntechnik.net/en/lifts/3418/datas.htm