Lift-Database » Lifts in the world
2-CLF Pontresina - Alp Languard
Line
Mountain Station
Mountain Station
General information | |
---|---|
Place | Pontresina |
resort | ?? |
Region | Grisons |
Country | |
Name of lift | Pontresina - Alp Languard |
Type | 2-CLF |
Lift manufacturer | Poma |
Year of construction | 1990 |
Commissioning date | 20/01/91 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Baco curve Baco-clamp with Reject hood |
geometric data | |
---|---|
Height of valley station | 1844,3 m |
Height of middle station(s) | 1939,8 m |
Height of mountain station | 2332,31 m |
Vertical rise | 497,96 m |
Route distance | 1348,22 m |
Horizontal length | 1247,25 m |
Average incline | 38,90 % |
Largest incline | 67,25 % |
Number of pillars | 17 Stk |
Greatest spanwidth | 152, m |
Max ground clearance | 15 m |
Trackwidth drive | 3,4 m |
Trackwidth line | 4,2 m |
Trackwidth return | 4,2 m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | 4 m |
Maximum capacity | 385 Pers/h |
Travel time | 14,9 min |
Driving speed line | 1,5 m/s |
electrical data | |
---|---|
Electrical control | SISAG |
Remote control and telemonitoring system | SISAG |
Power control system | SISAG |
Number of drive | 1 Stk |
Drive power (Start) | 155 kW |
Drive power (Operation) | 131 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | diesel engine |
Traction of emergency drive | hydrostatic |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Poma |
Cab model | 2E Fix |
Seating | polystyrene |
Seat heater | no |
Persons per cab | 2 |
Number of cabs | 96 Stk |
Cab distance | 28,3 m |
Cab interval | 18,8 s |
rope data | |
---|---|
Rope manufacturer | Drahtseilwerke Brugg |
Length of haul rope | 2709,45 m |
Total weight of haul rope | 10,1 t |
Haul rope diameter | 33 mm |
Nominal strength of haul rope | 2060 N/mm² |
Breaking strength of rope | 761 kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | 3,75 m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | right |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | 6 months |
Seasontime | ☀ summer |
Loading carpet | no |
Evacuation ropeway | no |
Integrated rescue system | yes |
Asset number (Trail map) | ?? |
Updates
Datas: 20/08/22
PHOTOS: ??
Lift-Statistics
16621 visit(s) since 06/10/03
Last visit 23/11/24
LIFT-WORLD IDs
Lift-ID: 3430
Place-ID: 393
https://www.seilbahntechnik.net/en/lifts/3430/datas.htm
Datas: 20/08/22
PHOTOS: ??
Lift-Statistics
16621 visit(s) since 06/10/03
Last visit 23/11/24
LIFT-WORLD IDs
Lift-ID: 3430
Place-ID: 393