Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Tauplitz I

Line
Line

Mountain Station
Mountain Station

Valley Station
Valley Station

General information  
Place Tauplitz 
resort Tauplitz 
Region Styria 
Country   
Name of lift Tauplitz I 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1995 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
2 ski holders per chair for the descent

geometric data  
Height of valley station 925 m
Height of mountain station 1170 m
Vertical rise 245 m
Route distance 1872 m
Horizontal length 1855,75 m
Average incline 13,18 %
Largest incline 45,20 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1611 Pers/h
Travel time 6,2 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Frey Austria 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Bubble colour neutral 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 88 Stk
Cab distance 44,71 m
Cab interval 8,94 s
Garage type ?? 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/02/24
PHOTOS: ??

Lift-Statistics
8927 visit(s) since 27/07/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 359
Place-ID: 568

https://www.seilbahntechnik.net/en/lifts/359/datas.htm