Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Gifthittli

Line
Line




Line
Line

General information  
Place Zermatt 
resort Matterhorn Ski Paradise 
Region Valais 
Country   
Name of lift Gifthittli 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2003 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2558,4 m
Height of middle station(s) ?? m
Height of mountain station 2932,00 m
Vertical rise 373,60 m
Route distance 1836,84 m
Horizontal length ?? m
Average incline 20,4 %
Largest incline ?? %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3200 Pers/h
Travel time 6,0 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 970 kW
Drive power (Operation) 650 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour neutral 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 115 Stk
Cab distance 33,75 m
Cab interval 6,75 s
Garage type ground floor 
Garage place mountain station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/04/23
PHOTOS: ??

Lift-Statistics
13440 visit(s) since 30/10/03
Last visit 22/12/24

LIFT-WORLD IDs
Lift-ID: 3593
Place-ID: 2017

https://www.seilbahntechnik.net/en/lifts/3593/datas.htm