Lift-Database » Lifts in the world
1-CLF Bischling 1
General information | |
---|---|
Place | Werfenweng |
resort | ?? |
Region | Salzburg |
Country | |
Name of lift | Bischling 1 |
Type | 1-CLF |
Lift manufacturer | Steurer |
Year of construction | 1969 |
Commissioning date | 1969 |
Date of closing down | 2011 |
Date of pull down | 2011 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Descent for tobbogan run |
geometric data | |
---|---|
Height of valley station | 1501 m |
Height of mountain station | 1836 m |
Vertical rise | 335 m |
Route distance | 845 m |
Horizontal length | 596,46 m |
Average incline | 44,90 % |
Largest incline | 72,00 % |
Number of pillars | 36 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 430 Pers/h |
Travel time | 6,9 min |
Driving speed line | 2,5 m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Steurer |
Cab model | ?? |
Seating | ?? |
Seat heater | no |
Persons per cab | 1 |
Number of cabs | ?? Stk |
Cab distance | ?? m |
Cab interval | ?? s |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Mountain station |
Tension type | rope tension weight |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | right |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | ?? months |
Seasontime | ?? |
Loading carpet | no |
Evacuation ropeway | no |
Integrated rescue system | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 27/04/23
PHOTOS: ??
Lift-Statistics
12061 visit(s) since 14/08/03
Last visit 19/03/24
LIFT-WORLD IDs
Lift-ID: 368
Place-ID: 32
https://www.seilbahntechnik.net/en/lifts/368/datas.htm
Datas: 27/04/23
PHOTOS: ??
Lift-Statistics
12061 visit(s) since 14/08/03
Last visit 19/03/24
LIFT-WORLD IDs
Lift-ID: 368
Place-ID: 32
https://www.seilbahntechnik.net/en/lifts/368/datas.htm