Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Olang 2





Line
Line





Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Olang / Valdaora
resort
Dolomiti Superski
Region Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Olang 2 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1989 
Commissioning date 1990

geometric data  
Height of valley station 2077,5 m
Height of mountain station 2278,5 m
Vertical rise 201 m
Route distance 1064,25 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2160 Pers/h
Travel time ?? min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Austria Draht 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model OMEGA 6s
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 58 Stk
Cab distance 48 m
Cab interval 9,5 s
Garage type ground floor
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 27/04/16 09:08:42
PHOTOS: 18/02/06 16:19:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
9336 visit(s) since 13/12/03
Last visit 19/11/19

LIFT-WORLD IDs
Lift-ID: 3688
Place-ID: 1496

https://www.seilbahntechnik.net/en/lifts/3688/datas.htm