Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  12-MGD Ciampinoi

Line
Line

Valley station
Valley station

Line
Line

General information  
Place Sëlva 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift Ciampinoi 
Type 12-MGD 
Lift manufacturer Agamatic 
Year of construction 1989/09 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Received new gondolas from CWA in 2009

geometric data  
Height of valley station 1566,1 m
Height of mountain station 2247,6 m
Vertical rise 681,50 m
Route distance 1860 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time ?? min
Driving speed line 5,28 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 960 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model OMEGA 12 
Seating carpet 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab 12 
Number of cabs 49 Stk
Cab distance 93 m
Cab interval 20 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ITL
Currency (Construction costs) Italian lira 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) 29 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/05/23
PHOTOS: ??

Lift-Statistics
27157 visit(s) since 01/01/04
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 3720
Place-ID: 1663

https://www.seilbahntechnik.net/en/lifts/3720/datas.htm