Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Wildkogel II












Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Neukirchen am Grossvenediger
resort Wildkogel

Region Salzburg
Country AT Austria, Österreich
Name of lift Wildkogel II 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1991 
Commissioning date ??

geometric data  
Height of valley station 1642 m
Height of mountain station 2100 m
Vertical rise 458 m
Route distance 1125 m
Horizontal length ?? m
Average incline 42,6 %
Largest incline 64,5 %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2150 Pers/h
Travel time 4 min
Driving speed line 5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DS 106
Cab manufacturer CWA
Cab model ??
Seating ??
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 154 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ??  ATS 
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 22/08/21 16:34:33
PHOTOS: 12/12/07 19:07:00

Lift-Statistics
10360 visit(s) since 16/04/04
Last visit 30/11/21

LIFT-WORLD IDs
Lift-ID: 4035
Place-ID: 188

https://www.seilbahntechnik.net/en/lifts/4035/datas.htm