Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Beauregard


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place La Clusaz
resort La Clusaz - Manigod
Region Rhône-Alpes
Country FR France
Name of lift Beauregard 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2003 
Commissioning date ??

geometric data  
Height of valley station 1040 m
Height of middle station(s) ?? m
Height of mountain station 1640 m
Vertical rise 600 m
Route distance 1678 m
Horizontal length ?? m
Average incline 39 %
Largest incline 87 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity (1715) 2200 Pers/h
Travel time 4,7 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope 3540 m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control SEIREL 
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) 781 kW
Drive power (Operation) 680 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type A108
Cab manufacturer CWA
Cab model ??
Seating ??
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs (40) 48 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs 6,550,000  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/06/20 20:48:41
PHOTOS: 14/10/16 23:10:08

Lift-Statistics
4606 visit(s) since 15/03/05
Last visit 05/08/20

LIFT-WORLD IDs
Lift-ID: 4077
Place-ID: 1051

https://www.seilbahntechnik.net/en/lifts/4077/datas.htm