Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Hochgurglbahn 1


Valley station
Valley station

Valley station
Valley station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
Through operation with Hochgurglbahn 2.

General information  
Place Hochgurgl
resort Obergurgl-Hochgurgl
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Hochgurglbahn 1 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2001 
Commissioning date ??

geometric data  
Height of valley station 1789 m
Height of mountain station 2160 m
Vertical rise 371 m
Route distance 911 m
Horizontal length ?? m
Average incline 44,56 %
Largest incline 74,30 %
Number of pillars 6 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2489 Pers/h
Travel time 2,7 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type ??
Tension way ?? m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 560 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Middle station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Swoboda
Cab model ULTRA 8 S
Seating carpet
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 32 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 4,5 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 07/01/10 20:31:00
PHOTOS: 02/01/04 21:00:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
12607 visit(s) since 25/12/02
Last visit 11/11/19

LIFT-WORLD IDs
Lift-ID: 420
Place-ID: 61

https://www.seilbahntechnik.net/en/lifts/420/datas.htm