Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


1-CLF Treceira


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
Originally built in 1974 at Sauze d'Oulx-Clotes, then moved in 1980 on the connection between Jouvenceaux and Prariond. The chairlift was moved the second time in 1987 and positioned at Treceira.

General information  
Place Sauze d'Oulx
resort
Region Piemonte
Country IT Italy, Italia
Name of lift Treceira 
Type 1-CLF 
Lift manufacturer Marchisio 
Year of construction 1987 
Commissioning date ??
Date of closing down ??
Date of pull down ??

geometric data  
Height of valley station 2412 m
Height of mountain station 2470 m
Vertical rise 58 m
Route distance 987 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 720 Pers/h
Travel time ?? min
Driving speed line ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulically (fix)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer ??
Cab model ??
Seating ??
Seat heater no
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ??
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 18/10/15 20:32:38
PHOTOS: 19/04/10 21:29:00

Lift-Statistics
6218 visit(s) since 16/05/04
Last visit 13/08/20

LIFT-WORLD IDs
Lift-ID: 4280
Place-ID: 1588

https://www.seilbahntechnik.net/en/lifts/4280/datas.htm