Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Kronplatz 2

Middle station
Middle station

Line
Line

Line
Line

General information  
Place Bruneck / Brunico 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift Kronplatz 2 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2003 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1851 m
Height of mountain station 2259 m
Vertical rise 408 m
Route distance 1160 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2250 Pers/h
Travel time 3,3 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) 700 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model OMEGA III-8 LWI 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 39 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 29/04/23
PHOTOS: ??

Lift-Statistics
18034 visit(s) since 30/05/04
Last visit 26/12/24

LIFT-WORLD IDs
Lift-ID: 4371
Place-ID: 1329

https://www.seilbahntechnik.net/en/lifts/4371/datas.htm